COMPARABLES · SEC FILINGS · SNAPSHOT 19 OCTOBER 2026

Listed AI infrastructure, from its own filings.

What GPU clouds, AI data-centre developers and the established colocation companies report to the SEC: revenue, contracted backlog, assets, debt and capital spending. Each figure links to the filing it comes from. Market values are not shown.

A high-voltage substation in a snowy valley at dusk
AI illustration · not a real site

As filedLatest value each company tagged in a 10-K or 10-Q, with its period end.

CompanyRevenue, quarterOperating income, quarterRevenue, yearBacklog (RPO)Property & equipmentDebtCapex, year
CoreWeave CRWVGPU cloud$2.6B10-Q · Jun 2026−$49M10-Q · Jun 2026$5.1B10-K · Dec 2025$103.7B10-Q · Jun 2026$46.7B10-Q · Jun 2026$35.6B10-Q · Jun 2026$10.3B10-K · Dec 2025
IREN IRENGPU cloud and data centres$145M10-Q · Mar 2026−$234M10-Q · Mar 2026$707M10-K · Jun 2026$5.1B10-K · Jun 2026$6.8B10-K · Jun 2026$7.6B10-K · Jun 2026$3.0B10-K · Jun 2026
Applied Digital APLDAI data-centre developer$342M10-Q · Aug 2026−$62M10-Q · Aug 2026$611M10-K · May 2026—$6.3B10-Q · Aug 2026—$2.9B10-K · May 2026
TeraWulf WULFPower-led data-centre developer$45M10-Q · Jun 2026−$140M10-Q · Jun 2026$168M10-K · Dec 2025—$3.6B10-Q · Jun 2026$3.1B10-Q · Mar 2026$1.1B10-K · Dec 2025
Cipher Digital CIFRPower-led data-centre developer$25M10-Q · Jun 2026−$79M10-Q · Jun 2026$224M10-K · Dec 2025—$2.1B10-Q · Jun 2026$5.4B10-Q · Jun 2026$488M10-K · Dec 2025
Equinix EQIXColocation and interconnection$2.6B10-Q · Jun 2026$665M10-Q · Jun 2026$9.2B10-K · Dec 2025$15.0B10-Q · Jun 2026$25.2B10-Q · Jun 2026$19.9B10-Q · Jun 2026$4.3B10-K · Dec 2025
Digital Realty DLRData-centre REIT$1.6B10-Q · Mar 2026$268M10-Q · Mar 2026$6.1B10-K · Dec 2025—$26.9B10-Q · Mar 2026——

Published SEC EDGAR XBRL company facts. A dash means the company did not tag that figure in the last 18 months under the names InfraGrid reads. Debt is the company’s tagged long-term debt or debt carrying amount; companies define it differently. Fiscal years differ (Applied Digital ends in May, IREN in June).

RatiosComputed by InfraGrid from two filed values.

CompanyRevenue run-rateOperating marginRun-rate ÷ propertyBacklog ÷ run-rateDebt ÷ propertyCapex ÷ revenue
CoreWeave$10.3B-2%0.22×10.1 yrs0.76×2.0×
IREN$579M-161%0.09×8.8 yrs1.12×4.2×
Applied Digital$1.4B-18%0.22×——4.7×
TeraWulf$179M-314%0.05×—0.86×6.3×
Cipher Digital$99M-316%0.05×—2.55×2.2×
Equinix$10.5B25%0.42×1.4 yrs0.79×0.5×
Digital Realty$6.5B16%0.24×———

Calculated Run-rate = latest quarter × 4. Backlog ÷ run-rate reads as years of revenue already contracted. Property is net property and equipment (real estate investments for Digital Realty). Periods can differ between the two values in a ratio when a company has not filed both for the same date.

Not included yet: capacity in MW. Companies report it in text and slides rather than in tagged figures, and it is added only once each number is read from its filing. See Sauda, from public data for one site’s economics.

INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.