01 / GPU MARKETS / COST PLANNER

Plan the cost.

Compare what each provider listing would cost for your machine count and runtime.

Connecting to rate dataData: GPU Economy · CC BY 4.0

Independent InfraGrid does not sell compute and receives no payment from GPU providers. Rates are shown as each provider publishes them.

Your workload

Machine size and runtime are your assumptions. Listings are normalised per GPU-hour; a provider may require a different full-instance configuration.

What this estimate assumes

  • Listing rates are published US dollars per GPU-hour, read from provider price pages.
  • Machine count and GPUs per machine are your assumptions; a provider's instance sizes and minimum booking may differ.
  • Daily cost = listing rate × total GPUs × hours per day. The month uses 30 days; the total uses your duration. Each figure is rounded up to a cent once.
  • Rates are held constant. Storage, network, tax, discounts and future price changes are excluded.
  • Listings are published prices, not guaranteed capacity, performance, availability or a booking quote.
INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.