01 / GPU MARKETS / SUPPLIER AVAILABILITY

Check a supplier.

Configurations and reported availability from the connected supplier catalog.

EXPLORE THE GLOBE
CATALOG SOURCERunpod Secure Cloud
LOWEST OBSERVED RATE— / GPU-hour
MATCHING CONFIGURATIONS— EU
CATALOG

Source: Runpod GPU catalog ↗. Provider-reported list rates and availability, not confirmed reservations. One supplier is connected by this integration; additional suppliers are not yet supported.

GPU subtotals exclude storage, tax and service fees. The supplier must confirm the full configuration, final price and delivery.

INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.