12/12

Executable check groups passed

Including an independently specified arithmetic fixture and a 180-case boundary sweep. The same checks also run in the project’s test suite.

01 / PASS

Independent arithmetic fixture

8 × (700 + 150) W × 1.2 × 24 h = 195.84 kWh; at $0.10/kWh: $19.584.

02 / PASS

Electricity sensitivity

Increasing the tariff never lowers energy cost; energy demand stays constant.

03 / PASS

Facility overhead sensitivity

PUE 1–3 increases facility energy monotonically for a fixed IT load.

04 / PASS

Utilisation is not a power curve

Lower useful utilisation raises cost per useful hour without inventing lower metered draw.

05 / PASS

Missing evidence stops comparison

An absent tariff or electrical headroom produces no preferred location; absent carbon produces no emissions estimate.

06 / PASS

Electrical limit boundary

A demand equal to headroom passes; a demand above it is excluded.

07 / PASS

Residency constraint

A selected country excludes the other country, even when its assumed energy is cheaper.

08 / PASS

Invalid and hostile inputs

Zero utilisation, negative hours, fractional GPU count, unknown hardware and malformed links are rejected.

09 / PASS

Break-even consistency

At A’s calculated break-even tariff, both energy totals agree.

10 / PASS

Stress tests preserve the base case

Every shock leaves its input unchanged and stays inside model bounds.

11 / PASS

Reproducible report and link

Same explicit inputs produce the same report; valid link round-trips retain results.

12 / PASS

180-case boundary sweep

GPU counts × utilisation × draw: finite results, linear energy scaling and non-negative cost across 180 combinations.

What this establishes

  • Coherent arithmetic and units within the documented model.
  • Expected responses to controlled changes in assumptions.
  • Explicit handling of missing data and incompatible constraints.
  • Repeatable results from the same inputs.

What an operator pilot must establish

  • Actual power draw, PUE, tariffs and electrical headroom.
  • Measured workload performance and useful throughput.
  • Networking, cooling, residency controls and delivery timelines.
  • How well modeled results match measured outcomes.

No accuracy percentage, savings claim, certification or operator validation is asserted.

Method version 1.0.0. Synthetic tests validate specified model behavior; they are not a substitute for independent review. Sources and broader product methodology →

INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.