A stone hydropower station on a fjord at dusk, its arched windows lit
AI illustration · not a real site

CASE · PUBLIC DATA ONLY · CHECKED 2026-10-19

Sauda, from public data.

A 10 MW hydro-powered AI data centre in a former power station in Norway, read only from what its operator and investor have published, live wholesale power prices and published GPU rental rates. InfraGrid has no agreement with Terakraft or Vesper and no data from them.

What has been publishedFigures the companies state about themselves. InfraGrid has not verified them.

  • Published · company claim10 MW

    Capacity of the Sauda data centre once its refurbishment and upgrade programme is complete.

    Vesper press release, 1 Aug 2025
  • Published · company claim+60 MW

    Expansion potential near the existing site; the local substation is stated at 1,000 MW.

    Vesper press release, 1 Aug 2025
  • Published · company claimPUE < 1.1

    Power usage effectiveness stated by the company, with lake-water liquid cooling.

    terakraft.no
  • Published · company claim€80 /kW·month

    Reservation price, “starting at”. Terms of 3 to 5 years.

    Terakraft reservation page
  • Published · company claimfrom €0.06 /kWh

    Electricity offered to tenants, on a spot or fixed contract.

    Terakraft reservation page
  • Published · company claim50–150 kW

    Rack densities offered, with rear-door, direct-to-chip or immersion cooling.

    Terakraft reservation page

Around the sitePublished by third parties, each linked.

  • Published$165–265 /kW·month

    Colocation in Europe’s four largest markets (London, Frankfurt, Paris, Amsterdam), 250–500 kW requirements, Q1 2026. Frankfurt is highest at $235–265.

    CBRE, Global Data Center Trends 2026
  • Published · company claim2027 pilot

    Neurophos, a maker of optical inference chips, plans a pilot with Terakraft in 2027 as part of an early-access programme. Performance figures for the chip are the company’s own, from simulation.

    eeNews Europe

Wholesale power, liveDay-ahead prices by bidding zone. Sauda is in NO2. Wholesale only: no grid fees, taxes or a site’s own contract.

Loading prices…

A GPU cloud renting space at SaudaOne H100 GPU, one month. What a tenant earns renting it out, against colocation, energy and hardware. Every input is labelled; change any of them.

Energy price

Waiting for the published GPU rate and the ECB exchange rate…

Rental-price riskThe tenant’s margin had the H100 price followed its published history, every other input as above.

Waiting for the published price history…

What would make this real

  • Metered power, cooling and PUE from the site in place of company statements.
  • The actual energy contract and colocation price list, under agreement.
  • Reserved and available capacity, so a tenant could see what can be booked.

Related: listed AI infrastructure companies from SEC filings · weekly brief, built automatically · capacity demo on fictional sites (simulated).

Rows of server racks with liquid-cooling hoses
AI illustration · not a real siteLiquid-cooled racks, as an illustration of a high-density AI hall.
INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.