VISUAL INTELLIGENCE / BETA

See the constraint.
Understand the system.

A visual reading of AI compute: published market coverage, explicit energy assumptions and a separate fictional operating model.

Open Scenario Lab →

H100 SXM weekly median

Loading published history…

Inspect the source →

Loading published history…

Read the published values

Fictional fleet IT demand

1.9%
18.27 MWSimulated · latest hour of fixed 24 h example

SIMULATED · fixed example ending 13 Oct 2026, 12:00 UTC

Read the simulated values
2026-10-12T12:00 UTC
18.62 MW
2026-10-12T13:00 UTC
18.52 MW
2026-10-12T14:00 UTC
18.71 MW
2026-10-12T15:00 UTC
19.91 MW
2026-10-12T16:00 UTC
18.55 MW
2026-10-12T17:00 UTC
19.86 MW
2026-10-12T18:00 UTC
18.83 MW
2026-10-12T19:00 UTC
17.87 MW
2026-10-12T20:00 UTC
18.17 MW
2026-10-12T21:00 UTC
16.25 MW
2026-10-12T22:00 UTC
16.42 MW
2026-10-12T23:00 UTC
16.41 MW
2026-10-13T00:00 UTC
15.49 MW
2026-10-13T01:00 UTC
14.92 MW
2026-10-13T02:00 UTC
15.83 MW
2026-10-13T03:00 UTC
14.01 MW
2026-10-13T04:00 UTC
14.32 MW
2026-10-13T05:00 UTC
14.91 MW
2026-10-13T06:00 UTC
15.35 MW
2026-10-13T07:00 UTC
15.92 MW
2026-10-13T08:00 UTC
16.75 MW
2026-10-13T09:00 UTC
16.65 MW
2026-10-13T10:00 UTC
17.72 MW
2026-10-13T11:00 UTC
17.77 MW
2026-10-13T12:00 UTC
18.27 MW

Atlas reference locations

18Counted from the reference list · not facilities

CALCULATED · reference-list counts; not provider facilities

Read the reference counts
Norway
1 locations
France
1 locations
Germany
1 locations
United Kingdom
1 locations
Sweden
1 locations
Italy
1 locations
United States of America
3 locations
Canada
1 locations
Brazil
1 locations
Japan
1 locations
South Korea
1 locations
Singapore
1 locations
India
1 locations
Australia
1 locations
United Arab Emirates
1 locations
South Africa
1 locations
One model. Every chart updates.

These inputs are assumptions. For complete constraints, reports and all inputs, open Scenario Lab.

Loading scenario graphics…

INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.