INFRASTRUCTURE THESIS · A HYPOTHESIS TO TEST

The physical layer of intelligence.

AI is sold as software and paid for by the hour, but it is built from three physical things: accelerators, electricity and sites that can power and cool them. This page sets out why that matters to anyone who owns or finances energy and digital infrastructure, what InfraGrid does about it today, and what could prove the idea wrong.

Compute × energy × physical infrastructure

An accelerator module with a copper cold plate on slate
AI illustration · not a real site
01 · Compute

Priced by the hour, with wide spreads.

    GPU time is rented from dozens of providers at list prices that differ widely for the same card. The split above is published weekly; InfraGrid only divides one median by the other.

    Published GPU rates →
    A high-voltage substation in a snowy valley at dusk
    AI illustration · not a real site
    02 · Energy

    Demand is set to more than double.

    • 415 TWh → 945 TWh

      Data-centre electricity use in 2024 (around 1.5% of the world's consumption) and the IEA's projection for 2030.

      IEA, Energy and AI (2025)
    • 700 W → 1,400 W

      Stated power of one NVIDIA H100 SXM (up to 700 W) and one AMD Instinct MI355X (1,400 W typical board power). Power per card sets power and cooling per rack.

      Physical sheet per GPU, with manufacturer links
    Generators in a row inside a historic turbine hall
    AI illustration · not a real site
    03 · Physical sites

    Power, cooling and a grid connection decide where.

    The hypothesis

    Pressure-test it in Scenario Lab → · Inspect the executable beta checks →

    The value of AI compute will increasingly depend on where it runs: the price and source of power, the efficiency of the site, the time to connect it to the grid. Today these sit in separate places: GPU price lists, energy statistics, facility disclosures. A neutral view that joins price, power and place would be useful to those who rent compute and to those who build and finance the sites behind it. InfraGrid is an early attempt at that view. It is a hypothesis, not a finding.

    What InfraGrid is today, and what it is not

    Published · real data
    • Published GPU rental rates, weekly history and an H100 price index, with sources.
    • Manufacturer power per card and calculated cost per kW and per million tokens.
    • Published PUE and water figures from operators, each linked.
    • InfraGrid does not sell compute and receives no payment from GPU providers.
    Simulated · demonstration
    • Three fictional sites, their capacity units and their telemetry.
    • The capacity exchange and the control room: a model, not a market.
    • Scenario Lab models energy and carbon using explicit synthetic location assumptions; no measured site data.
    • No financial product, no offer, no return: nothing here can be bought.

    Roadmap

    Status only, no dates: each step ships when its data sources are verified. The longer direction, from data to contracts, is on Vision.

    StepWhat it addsStatus
    Published GPU ratesRental rates per GPU model from providers’ own price pages, weekly history, 7-day changes, a cost planner.Live
    Physical sheet per GPUManufacturer power per card, rent per kW of card power, cost per million tokens on published throughput.Live
    Specialist vs large-cloud indexGPU Economy’s weekly H100 price index, split by operator class, with provider counts.Live
    Scenario LabTwo-location energy comparison, power and residency constraints, stress tests and reproducible reports. Location inputs are assumptions; executable model checks are public.Live
    Energy cost per locationCard power × PUE × local electricity price, and carbon per GPU-hour, from public energy datasets. Not a full cost of ownership.Next
    Where should a workload runRental price, power cost, carbon and estimated latency ranked by location.Later
    Real facilities on the globeData centres and interconnection points from open registries, in place of reference cities.Later
    Operator sideCapacity exchange and control room on fictional sites, to show the model. Not a product.Demo only

    Risks and open questions

    • Grid connection. Power, not demand, may set the pace: connection queues can delay or cancel sites.
    • Utilisation and price. GPU rental list prices move week to week and differ by provider; capacity built today may rent for less tomorrow.
    • Hardware obsolescence. Higher-power accelerators may need more power and cooling per rack than a site was designed for.
    • Cooling and water. Higher densities change how sites are cooled and make water use part of the siting question.
    • Data quality. List prices are not transaction prices; the large-cloud index class rests on four providers; operator efficiency figures use their own definitions.
    • InfraGrid itself. Early stage, one primary source for rental rates, no audited data, and demonstrations that must stay clearly separate from real data.

    Not an offer

    This page describes a thesis and a product in development. It is not investment advice, not an offer of securities or of any other financial product, and it implies no return. Projections are the named sources' own. See Trust & method for every source and formula.

    INFRAGRID / SIMULATION

    How the demo works

    A transparent demonstration model.

    1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

    The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

    Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

    Published
    Real data from a named external source, shown as the source publishes it.
    Calculated
    Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
    Assumption
    A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
    Simulated
    Invented for the demonstration. It does not describe anything real.

    The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.