TRUST & METHOD

What is real here.

Where each figure comes from, how it is calculated, what is stored and what InfraGrid does not measure.

Rows of server racks with liquid-cooling hoses
AI illustration · not a real site

Visual intelligence

Charts are adapted from Bklit UI, under its MIT licence. Interface blocks receive InfraGrid datasets; the registry’s revenue, visitor and session examples are not used.

H100 history and the listing hierarchy use GPU Economy’s published snapshots; no fallback prices or counts are fabricated. The choropleth counts atlas reference cities, not facilities, capacity or provider coverage. Local map polygons derive from Natural Earth 1:110m countries, public domain, retrieved 13 October 2026.

Energy gauges, flows, sensitivity, cost deviation, configuration funnel and radar are calculations on Scenario Lab assumptions. The radar shows normalized input ratios, not a quality score. The heatmap is tariff × PUE, not dates. Power-flow links conserve kW. Modeled capacity, allocation rings, power candles and replay are explicitly simulated; candles aggregate hourly IT-demand samples into three-hour OHLC, not trading prices. Replay starts paused, respects reduced motion and stops when its view is unmounted.

Each visual has a readable value table. These charts add no tracking service or AI calls. Shared scenario fragments carry explicit assumptions into the visual analysis.

Scenario Lab: explicit assumptions, executable checks

Scenario Lab uses manufacturer board-power figures already recorded in our GPU physical sheets. Every preset electricity tariff, PUE, carbon factor and electrical headroom is synthetic and editable; no preset describes a real facility or current national average.

Facility energy = GPU count × (stated board watts × assumed average draw + allocated host watts) / 1000 × PUE × reserved hours. Energy cost = kWh × assumed USD/kWh. Productive GPU-hours = GPU count × reserved hours × utilisation. Average draw is independent of productive utilisation; the model infers no idle power curve. The energy component excludes hardware and other operating costs and is never added to rental prices.

Location-based emissions = kWh × assumed gCO₂e/kWh / 1000. Electricity, carbon and capacity data are not fetched or measured. Country selection is not a verification of residency compliance. Missing tariff or headroom blocks the cost comparison; missing carbon blocks the emissions estimate. All conclusions are conditional.

Beta validation executes the same model checks used by the test suite. It verifies specified arithmetic and behavior, not real-world accuracy. Explanations are rule-based; no AI model is called. Report downloads and shared URL fragments are generated in the browser. No scenario database or scenario telemetry is added.

Three labels

Data panels carry one of them; where a panel mixes published prices and InfraGrid's own calculations, both appear.

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

Independent

InfraGrid does not sell compute and receives no payment from GPU providers. It is not affiliated with GPU Economy or with any provider whose rates it shows.

The demonstration is simulated

The three sites, their capacity units and telemetry, the portfolio, the control room and the GRID token are invented. The sites are fictional and represent no real facility, operator or investor. Nothing on the site is an offer: no funds are taken, no ownership or capacity is transferred, and no return is promised.

Sources and licences

SourceUsed forTerms
Energy-Charts (Fraunhofer ISE)Day-ahead wholesale electricity prices for NO2, Germany-Luxembourg, France and Italy north on the Sauda case and the weekly brief.api.energy-charts.info, CC BY 4.0, from ENTSO-E and Bundesnetzagentur SMARD data. Read at most every 30 minutes; if it fails, prices are not shown.
ECB reference rate, via FrankfurterUS dollar to euro conversion in the Sauda tenant model.frankfurter.dev, European Central Bank daily reference rate.
SEC EDGAR company factsRevenue, backlog, assets, debt and capital spending on the comparables page.SEC EDGAR APIs, public US filings. A dated snapshot, refreshed by a script; each figure links to its filing.
Terakraft and Vesper public pagesSauda capacity, expansion potential, PUE, reservation and energy prices, shown as the companies’ own claims.terakraft.no and the Vesper press release of 1 August 2025, read 19 Oct 2026. InfraGrid has no agreement with either company and no data from them.
Editorial imagesPhotographs of fjords, halls, racks and substations across the site.Generated with an image model (fal.ai, Nano Banana 2.1) on 19 Oct 2026 and captioned “AI illustration · not a real site”. None shows a real facility.
GPU Economy open datasetPublished GPU rental rates on GPU Markets and the cost planner, and the weekly H100 SXM price index.gpueconomy.com/data, CC BY 4.0. Normally refreshed every 15 minutes; a failed read may be retried sooner. Not a settlement price.
NVIDIA and AMD product pagesCard power on the physical sheet of each GPU.The manufacturer’s stated figure, linked and dated next to it. Cards without a per-card figure show none.
NVIDIA inference benchmarksOutput tokens per second per GPU, for the cost per million tokens.Figures NVIDIA's, as selected by GPU Economy (CC BY 4.0 for the selection). Each card runs in its own configuration.
Operator efficiency publicationsPublished PUE and WUE figures next to the demo sites’ invented PUE.Read 8 Oct 2026: PUE 1.09, Google, Fleet of large-scale data centers, average annual, 2025 (Google data center efficiency page); PUE 1.38, Digital Realty, Global portfolio, 2025 (Digital Realty 2025 Impact Report release, 27 May 2026); PUE 1.31, Digital Realty, EMEA portfolio, 2025 (Digital Realty 2025 Impact Report release, 27 May 2026); PUE 1.54, Uptime Institute survey, Average reported by survey respondents, as quoted by Google, 2025 survey (Google data center efficiency page, citing the Uptime Institute 2025 Global Data Center Survey); WUE 0.59, Digital Realty, Global portfolio; the release gives no unit, 2025 (Digital Realty 2025 Impact Report release, 27 May 2026).
Runpod GPU catalogSupplier availability, read-only, when a key is configured.Not connected today: the page shows a pending state and an optional, labelled sample.
NASA Blue Marble imageryEarth imagery on the globe, and the land mask from which the region silhouettes are sampled.NASA imagery, published freely by NASA, used under NASA's media usage guidelines: credited, and implying no NASA endorsement.
Natural Earth 1:110m admin-0 countriesCountry outlines on the network and exchange maps, and the dotted land grid of the globe.Dataset, public domain under the Natural Earth terms of use.

How figures are calculated

Median, 25th and 75th percentile Published
GPU Economy's card median: each provider once, at its cheapest on-demand rate; community capacity and marketplace floors left out.
Lowest listed Calculated
The cheapest live on-demand listing that is not a marketplace floor.
7-day change Calculated
Median now ÷ median a week ago − 1, on the same basket of live US-dollar on-demand list rates read both times. Shown only with at least three such listings.
Cost per GB Calculated
Median rate ÷ the card’s memory in GB.
Rent per kW of card power Calculated
Median rate ÷ the card’s stated power in kW. Card only: no host, cooling or facility overhead.
Cost per million output tokens Calculated
Rate ÷ (output tokens per second per GPU × 3,600) × 1,000,000, on NVIDIA’s published throughput.
H100 SXM index by operator class Published
GPU Economy’s weekly median listed on-demand H100 SXM price, split into specialist GPU clouds and large clouds, each with its provider count.
Large clouds ÷ specialists Calculated
The large-cloud median divided by the specialist median for the same week.
Planner estimate Calculated
Rate × machines × GPUs per machine × hours per day × days, rounded up to the cent once. Excludes storage, tax and fees.
Estimated fibre round trip Calculated
2 × great-circle distance × 1.4 ÷ 200 km per ms + 0.8 ms. An estimate from geography, not a measurement.
Site facility power Simulated
IT capacity × PUE, from the invented values of a fictional site.
Capacity unit Simulated
1 unit = 10 kW of modelled IT capacity. A demonstration unit with no price, not a product.

What is stored

Kept in your browser; InfraGrid does not collect them. Clearing the site's data removes them.

Browser storage keyHolds
infragrid.demo.v1Your demo portfolio and allocations.
infragrid.grid.v1Your GRID Lab demo balances and activity.
infragrid-rate-watch-v1Rate targets you save on GPU Markets.
infragrid-market-watchlist-v1Configurations you save on the supplier page.
infragrid.testnet.contract.v1The test contract address you choose on the testnet page.

On InfraGrid's server, only when capacity requests open on Requests: your wallet address, the request you write (GPU, region, count, hours, workload text) and its status history, visible to you and the operator. Sign-in is a wallet signature with no transaction; sessions last eight hours in an HttpOnly cookie. Rate limits store only a one-way hash of the IP address or wallet they count. The site loads no analytics or advertising scripts. Its fonts come from Google Fonts, which receives your browser's request for them. On wide screens without a reduced-motion setting, the home page plays a background film (about 0.5 MB) served by InfraGrid itself; phones and reduced-motion browsers get a still image instead.

What InfraGrid does not measure

  • Real use, power or cooling of any site: the control room is simulated.
  • Whether a provider has capacity in stock: published rates are not availability.
  • Network latency: round trips are estimated from distance.
  • Energy prices and carbon emissions: not shown yet.
  • Water use of any site: the demo sites carry no water figure.

Official channel

The site is infragrid.exchange. InfraGrid never asks for funds, private keys or recovery phrases. The only transactions it can prepare are on the Robinhood Chain test network (46630), with test tokens that have no value.

INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.