SCENARIO LAB / BETA 01

Pressure-test the
physical layer of AI.

Two locations. One workload. Find the constraint that changes the decision — and the evidence an operator needs to confirm it.

Inspect the model
Executable beta checks →
PUBLISHED Manufacturer board power /ASSUMED Every location input /CALCULATED Results, thresholds and stress tests
Shared workload

Average power draw covers all reserved hours. Productive utilisation changes useful GPU-hours, not the power curve. Host allocation includes an assumed share of CPU, memory and networking.

A Location assumptions
B Location assumptions

Preset values are deliberately synthetic. They are not current national tariffs, carbon factors, PUE measurements or available capacity.

MODEL 1.0.0

Your current assumptions.

A

Norway

Within assumed limits

Modeled electricity cost / productive GPU-hour

$0.0816

Energy component only · conditional estimate

Facility demand
209.02 kW
Reserved-period energy
150.50 MWh
Electricity total
$10,534.81
Location-based emissions estimate
6.02 tCO₂e

Lower energy cost among the two eligible scenarios.

B

France

Within assumed limits

Modeled electricity cost / productive GPU-hour

$0.1521

Energy component only · conditional estimate

Facility demand
227.20 kW
Reserved-period energy
163.58 MWh
Electricity total
$19,630.08
Location-based emissions estimate
13.09 tCO₂e
WHAT CHANGES THE DECISION

Norway has the lower modeled energy cost.

At these assumptions, the difference is $9,095.27 over 720 reserved hours. This is an energy comparison, not a total-cost or site recommendation.

To make A and B equal on energy cost, A’s tariff would need to be $0.1304/kWh, holding everything else constant. This threshold does not override constraints.

Where the energy advantage disappears

A tariff sweep · other inputs fixed
$0.035
A lower
$0.053
A lower
$0.070
A lower
$0.088
A lower
$0.105
A lower
$0.140
B lower

Light: A · muted: B. Bars compare energy totals within each row; they are not a shared absolute scale.

All stress tests, side by side

Each shock starts independently from your base assumptions.

TestA · energy USDB · energy USDComparison
Base case$10,534.81$19,630.08A lower
A: electricity +30%$13,695.25$19,630.08A lower
Utilisation −20 pp$10,534.81$19,630.08A lower
A: PUE +0.15$11,908.92$19,630.08A lower
A: headroom −50%$10,534.81$19,630.08Check constraints / evidence
Board draw +20%$12,196.64$22,726.66A lower

Follow the power.

The active stress test updates these graphics. Open the complete visual analysis →

Loading power-flow graphics…

04 / THE OPERATOR HANDOFF

Know what to ask next.

These are the measurements and confirmations that would turn a synthetic comparison into an operator pilot.

  1. Metered GPU and host power across active and idle time?
  2. Available IT/facility power, rack density and cooling envelope?
  3. Delivered electricity tariff, taxes and contractual duration?
  4. Measured PUE boundary and location-based carbon methodology?
  5. Grid connection date, workload performance, network and data-residency controls?
See what the beta can already verify

A decision you can inspect.

Export every assumption, result, source and stress test. Reports always contain the base case and all independent shocks.

Method, evidence and limits
  • IT kW = GPU count × (stated board W × average draw fraction + allocated host W) / 1000.
  • Facility kW = IT kW × PUE; kWh = facility kW × reserved hours.
  • Energy USD = kWh × assumed USD/kWh; kgCO2e = kWh × assumed gCO2e/kWh / 1000.
  • Productive GPU-hours = GPU count × reserved hours × utilisation fraction. Not benchmarked work or model throughput.
  • The average draw assumption covers the whole reserved period, independently of productive utilisation. No idle power curve is inferred.
  • Energy only: excludes hardware, staffing, connectivity, storage, tax and financing. Never added to a rental price.
  • Country is an assumed deployment location, not a certification of data sovereignty or legal compliance.
  • All results are conditional on assumptions. No facility, grid connection, availability, latency or emissions is verified.

Published board-power reference: manufacturer product page. Assumed location PUE is separate from published operator efficiency references.

The explanatory text is generated from explicit rules and calculations. No AI inference service, operator measurement, workload benchmark or real GPU job is involved.

INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.