Back to the exchange
DE-FRA-03 / FICTIONAL SITE · DEMONSTRATION

Frankfurt Low-Latency AI Vault

Frankfurt, GermanyEdge & hyperscaleFictional
Locate in atlas
Simulated · all values invented
IT capacity
15 MW
PUE
1.15
Energy
Certified green energy (demo assumption)
Cooling
Not specified
Grid connection
Not modelled

The city is real; the site is not. Compare its PUE with published figures under Technical profile, and read why location matters in the infrastructure thesis.

CAPACITY SCHEMATIC / DEILLUSTRATIVE INFRASTRUCTURE
STANDARDIZED CAPACITY1 MODULE = 1 MWCOMPUTE / POWERZXY
Frankfurt AI highlighted in the 30 MW demo network15 MW / 1,500 CU

Operations now · simulated

Simulated · telemetry
—Compute load
—Utilisation
—PUE now
—Healthy GPUs
Open control room
WHAT THIS FICTIONAL SITE ILLUSTRATES

Next to the network.

A fictional 15 MW site modelled at a network interconnection hub. It illustrates placing compute next to the networks, where latency is low and space and power are in demand.

COMPUTE

Edge AI & hyperscale

Interconnection hub

THERMAL DESIGN

Cooling profile pending

1.15 illustrative power usage effectiveness

ENERGY PROFILE

Certified green energy (demo assumption)

Invented demo values for a fictional site.

Demo allocation

675 / 1,500 units allocated
AllocatedAvailable1 block ≈ 1% of capacity

A fictional demo site. It does not represent, and is not affiliated with, any real facility, operator or investor.

INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.