Back to the exchange
FR-PAR-02 / FICTIONAL SITE · DEMONSTRATION

Paris Enterprise HPC Vault

Paris, FranceEnterprise HPCFictional
Locate in atlas
Simulated · all values invented
IT capacity
5 MW
PUE
1.12
Energy
Energy mix unspecified
Cooling
Direct liquid cooling
Grid connection
Not modelled

The city is real; the site is not. Compare its PUE with published figures under Technical profile, and read why location matters in the infrastructure thesis.

CAPACITY SCHEMATIC / FRILLUSTRATIVE INFRASTRUCTURE
STANDARDIZED CAPACITY1 MODULE = 1 MWCOMPUTE / POWERZXY
Paris Enterprise highlighted in the 30 MW demo network5 MW / 500 CU

Operations now · simulated

Simulated · telemetry
—Compute load
—Utilisation
—PUE now
—Healthy GPUs
Open control room
WHAT THIS FICTIONAL SITE ILLUSTRATES

Close to customers, at city costs.

A fictional 5 MW enterprise campus modelled near a large city, with direct liquid cooling and a high-availability design. It illustrates building close to customers, where space and power cost more.

COMPUTE

Enterprise AI campus

High-availability design · indicative SLA only

THERMAL DESIGN

Direct liquid cooling

1.12 illustrative power usage effectiveness

ENERGY PROFILE

Energy mix unspecified

Invented demo values for a fictional site.

Demo allocation

410 / 500 units allocated
AllocatedAvailable1 block ≈ 1% of capacity

A fictional demo site. It does not represent, and is not affiliated with, any real facility, operator or investor.

INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity on a fictional site. Capacity units carry no price and confer no right to energy, compute or ownership.

The demonstration shows no prices, yields, returns or value projections. Energy at full load is a physical reference, not a promise of delivered energy.

Data panels carry one of three labels; where a panel mixes published prices and InfraGrid's own calculations, both appear:

Published
Real data from a named external source, shown as the source publishes it.
Calculated
Computed by InfraGrid with a stated formula, from published data, InfraGrid’s own reference lists or your inputs. An estimate, not a quote or a measurement.
Assumption
A value with no published source, chosen by InfraGrid or by you as an input. Change it to test it.
Simulated
Invented for the demonstration. It does not describe anything real.

The three sites are fictional. Their facilities, availability, technical characteristics, SLA and energy references are invented for this demonstration and do not describe any real facility, operator or investor. No funds, ownership rights, or physical capacity are transferred.