Back to the exchange
NO-SAU-01 / ILLUSTRATIVE ASSET

Sauda Hydro Compute Vault

Sauda, NorwayGPU computeDemo reference
Locate in atlas
CAPACITY SCHEMATIC / NOILLUSTRATIVE INFRASTRUCTURE
STANDARDIZED CAPACITY1 MODULE = 1 MWCOMPUTE / POWERZXY
Sauda Hydro highlighted in the 30 MW demo network10 MW / 1,000 CU
PHYSICAL FOUNDATIONS

Powered by water. Built for intelligence.

High-performance GPU capacity at the meeting point of Nordic hydropower and AI. A model for energy-conscious, compute-intensive workloads.

COMPUTE

High-performance GPU

NVIDIA H100 reference

THERMAL DESIGN

Lake water cooling

1.04 illustrative power usage effectiveness

ENERGY PROFILE

100% hydro energy

Provided reference information, not independently verified.

Capacity, made legible.

680 / 1,000 units allocated
AllocatedAvailable1 block ≈ 1% of capacity

Supplied reference label: “Vesper Portfolio Asset”. This is illustrative source terminology, not a verified affiliation, endorsement, or commercial partnership.

INFRAGRID / SIMULATION

How the demo works

A transparent demonstration model.

1 capacity unit (CU) represents 10 kW of modeled IT capacity. The illustrative unit price uses a 1,000-hour pricing reference: 10 kW × 1,000 h = 10 MWh. USD and USDC are treated 1:1 for this demonstration only.

Annual figures apply the stated simple annual rate to the simulated allocation value. They exclude fees, compounding, utilization, and losses. They are scenarios, not forecasts or guaranteed returns. The 1,000-hour pricing reference is not a contract duration or a promise of delivered energy.

All facilities, availability, technical characteristics, SLA and certification references are supplied examples and are unverified. Named reference organizations are not InfraGrid partners. No funds, ownership rights, or physical capacity are transferred.